Another section of the Vilnius-Utena road is being designed
The design works of the main road from Molėtai to Utena are starting. The contracts signed by the Directorate of Motor Roads of VĮ Lithuania regarding the main road came into force...
The design works of the main road from Molėtai to Utena are starting. The contracts signed by the Directorate of Motor Roads of VĮ Lithuania regarding the main road came into force...
The Directorate of Motor Roads of Lithuania informs that due to the extremely high temperature, the concrete slabs on some main roads of national importance have deformed...
The long-awaited reconstruction works of the A14 Vilnius-Utena road are starting. In the first phase, a 4,2 km long section will be reconstructed - from the 16th kilometer, ...
This week, the Directorate of Motor Roads of Lithuania announced the second 24,4 mln. the tender for the reconstruction of the main road Vilnius-Utena with a maximum value of EUR. For the first approx...
The Directorate of Motor Roads of Lithuania terminated the tender for the reconstruction of the Vilnius-Utena section of the first concrete road built several decades ago due to excessive prices. Expected, ...
On Friday, the Directorate of Motorways promises to announce the first tender for the reconstruction of the Vilnius-Utena concrete road built several decades ago. This was reported to BNS by the temporary Road...
The municipality of Utena, which is increasingly hastening the reconstruction of the Vilnius-Utena main road lined with concrete slabs in poor condition, may have to endure a few more years - ...
© 2012-2022, UAB "New Media Group". All rights reserved.